Specifications include, but are not limited to: The project work consists of the following major items and approximate quantities: Base Bid Furnish and Install Cell Liner 443,000 SF, Remove Existing Polyethylene Liner 443,000 SF, Remove and Replace Rip Rap 3,700 CY, Remove and Replace Liner Protection (Earth) 17,000 CY, Earthwork 32,000 CY, Liner Subbase 6 Depth 8,300 CY, Aggregate Access Road 3,100 SY, Refurbish Drainage Control Structure 1 EA, Remove and Replace Existing Aeration Equipment 16 EA, Seeding 1.0 Acre, Mulching 1.0 Acre. Additive Alternate No.1 8 Sanitary Sewer Line 120 LF, Y Sanitary Sewer Connection to 15 Sanitary 1 EA, Sanitary Valve Vault 1 EA, Sanitary Meter Vault 1 EA Additive Alternate No.2 Furnish Aspirating Aerators