The Village is constantly evaluating its roads to better serve its residents and community at-large. Through a Village-wide Capital Improvement Plan, the Village targeted select roadways that are in need of resurfacing, patching, or reconstruction. A Pavement Conditions Report indicated that Blackhawk Drive from University Parkway to Hickock Avenue is in very poor condition. The solution was determined to be milling and resurfacing to bring this roadway to satisfactory condition. The following section details the Scope of Work for this Project. The project area is approximately 3,300 linear feet. The Scope of Work is generally described as: • 4” Milling • Preparation of Base • 1.5” HMA Surface Course • 2.5” HMA Binder Course • Tack and Prime Coat • Pavement Markings • Storm Structure Cleanout • Erosion Control • Traffic Control; Appendix A contains the Bid Plans including specifications and summary of quantities.