Specifications include, but are not limited to: The work consists of 4.9 miles of cape seal, thermoplastic pavement markings, raised reflective pavement markers, protecting or resetting survey markers, and other necessary work to complete the project. Pay Item # UOM Description Type Quantity Unit Price X0327980 SQ FT PAVEMENT MARKING REMOVAL - WATER BLASTING Base items 1,830.000 Z0033650 TON LONGITUDINAL JOINT REPAIR Base items 1.200 Z0049799 EACH PROTECTING OR RESETTING SURVEY MARKERS Base items 9.000 40500061 SQ YD CAPE SEAL, TYPE II Base items 80,262.000 67100100 L SUM MOBILIZATION Base items 1.000 70100450 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701201 Base items 1.000 70100460 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701306 Base items 1.000 70102620 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701501 Base items 1.000 70102635 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701701 Base items 1.000 70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 28.000 70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 5,045.000 70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 841.000 70300220 FOOT TEMPORARY PAVEMENT MARKING - LINE 4" Base items 59,612.000