Loading...
Skip to main content

Illinois Purchasing Group

Local Illinois government bids & RFPs

Illinois Purchasing Group


Welcome to the Illinois Purchasing Group!

Register for extensive access to statewide RFPs, bids and awards throughout Illinois from 934 government agencies. Registered vendors benefit from more state and local government bid information in a central location, less paperwork and an easier method of doing business with Illinois state & local governments. Please register with Statewide access for open bids and RFPs.

Vendor Registration

Grow your government business in Illinois! Register today to receive real-time notifications of matching bids, access documents & receive real-time addendum.

Register Now

Filters
 What’s the difference?

Statewide Bids:Additional solicitations from government agencies throughout the state(s)

Group Bids: Exclusive bids from agencies published directly in the Purchasing Group

Solicitation Title Location Published Date Closing Date
0.041 Mile of pavement removal, earth excavation, and jointed PCC pavement at the sign shop parking lot in Paris. Illinois 03/23/2020 04/24/2020
0.8 miles of new HMA shoulders on US 45 from the southern edge of Hord to Bible Grove Road. Illinois 03/23/2020 04/24/2020
3 miles of resurfacing on I-155 from 2 miles south of US 136 to the Tazwell County line. Also includes bridge repair on SN 054-0078 carrying Emden Road over I-155. Illinois 03/23/2020 04/24/2020
Microsurfacing TR 401 from IL 336 to the west corporate limits of Bowen, and Micorsurfacing FAS 432 from South Street in Augusta to the Adams County line. Illinois 03/23/2020 04/24/2020
Construction of a multi-use path adjacent to Reed Road from Vine Street to IL 47 in the Village of Huntley. Illinois 03/23/2020 04/24/2020
Bridge painting on US 50 over North Walnut Street in Breese (SN 014-0066 and 014-0067) Illinois 03/23/2020 04/24/2020
2.2 miles of patching, milling, resurfacing, ADA sidewalk upgrades and curb and gutter replacement on IL 121 from 0.2 miles west of 300E to 20th Street in Mattoon. Illinois 03/23/2020 04/24/2020
Landscape repair work at various expressway and primary locations in District 1. Illinois 03/23/2020 04/24/2020
7.6 miles of patching, HMA surface removal, resurfacing, rumble strips and aggregate shoulders on IL 34 from the Pope County line to just north of IL 146. Illinois 03/23/2020 04/24/2020
Resurfacing on IL 29 from 0.2 mile S of Cloverdale Rd in Chillicothe to Dickison Run Creek, N of IL 6 in Peoria County. Illinois 03/23/2020 04/24/2020
0.1 miles of resurfacing along IL 156 bridge approach pavements at Prairie Du Long Creek Road (SN 067-0039). Illinois 03/23/2020 04/24/2020
Cold milling, pavement patching, and HMA resurfacing on eastbound US 20 0.6 mile W of IL 26 to IL 75 Illinois 03/23/2020 04/24/2020
Reconstruction of East State Street from Mauvaisterre Street to Clay Street in Jacksonville. Illinois 03/23/2020 04/24/2020
Designed overlay and ADA improvements on US 52 from Eden Ln to E of Joyce Rd. Illinois 03/23/2020 04/24/2020
Milling and resurfacing 2.75" on mainline pavement and parking located mainly on IL 23 from Sycamore and ending in Genoa. ADA improvements, guardrail updates , and minor drainage work are also include Illinois 03/23/2020 04/24/2020
ADA improvements along various state routes in Dupage and Will Counties. Illinois 03/23/2020 04/24/2020
Bridge deck patching, approach pavement patching and new bridge joints at 4 structures on IL 16 west of Charleston. SN 015-0015 and 015-0016 carrying IL 16 over Eastern Illinois RR; SN 015-0017 and 01 Illinois 03/23/2020 04/24/2020
Resurfacing on State Street from 0.1 miles north of Delmar Avenue to 0.1 mile south of Rozier Street in Alton Illinois 03/23/2020 04/24/2020
Cold milling, pavement patching, and HMA resurfacing on IL 2 from Pines Rd to Jefferson St in Oregon. Illinois 03/23/2020 04/24/2020
Replace the bridge carrying TR 41D over Mud Creek, 2.5 miles southeast of Blackstone. Illinois 03/23/2020 04/24/2020
Resurfacing Sullivan Drive from 0.1 mile south of Longacre Drive to Frank Scott Parkway in Belleville. Illinois 03/23/2020 04/24/2020
Bridge deck repairs including full and partial depth bridge deck patching, and the removal of existing asphalt over the patches on I-80 from Center St to Rowel Ave in Joliet. Illinois 03/23/2020 04/24/2020
Resurfacing on Hanover Road from the GMandO Railroad to IL 3, and construction of right turn lane from Hanover Road onto southbound IL 3. Illinois 03/23/2020 04/24/2020
SMART Overlay and ADA improvements on US 6 from IL-50 to E of I-294. Illinois 03/23/2020 04/24/2020
Sidewalk replacement, construction of a segmental block wall and pavement markings on Grant Street at McArthur School in Macomb. Illinois 03/23/2020 04/24/2020
Replace the bridge carrying Hagen Road over Indian Creek, 2.0 miles northwest of Eldorado. Illinois 03/23/2020 04/24/2020
9 miles of patching on I-57 from MP 182 to MP 191 and 0.2 miles of patching on Old IL 316 from D Street to A Street in Charleston. Illinois 03/23/2020 04/24/2020
5.76 miles of SMART overlay consisting of milling and resurfacing of 2" of HMA and additional ADA, guardrail, and drainage improvements from E of IL 40 to Hazelwood Dr in Wyanet. Illinois 03/23/2020 04/24/2020
321.6 ft of bridge deck repairs on SN 010-0056 carrying IL 47 over I-72. Illinois 03/23/2020 04/24/2020
4 miles of microsurfacing on US 24 from the eastern city limits of Astoria to west of Izaak Walton Rd. Illinois 03/23/2020 04/24/2020
Resurfacing Crenshaw Road from Skyline Road to Pease Road. Illinois 03/23/2020 04/24/2020
Bridge deck overlay and joint repairs on IL 72 over the Fox River. Illinois 03/23/2020 04/24/2020
9.3 miles of milling, patching, resurfacing, HMA and aggregate wedge shoulders on US 51 from 0.5 miles north of the Shelby County line to the US Business 51 interchange southwest of Decatur. Illinois 03/23/2020 04/24/2020
Drainage improvement, and ADA improvements at the drainage ditch along the N side of FAU Fullerton Ave from Sarah St to Silver Creek Dr in Franklin Park. Illinois 03/23/2020 04/24/2020
Project 14,023 LF. Pavement widening, pavement reconstruction, construction of a turnabout, curb and gutter, sidewalk, proposed drainage. replacement of a box culvert with three box culverts and two r Illinois 03/23/2020 04/24/2020
4.8 miles of milling, resurfacing, shoulder reconstruction and guardrail on US 136 from 0.3 miles west of I-155 to East Union Road. Also includes microsilica overlay, median replacement, preformed joi Illinois 03/23/2020 04/24/2020
3P milling and resurfacing (Standard Overlay) on SBI 23 from Coltonville Rd to Highland Dr in Sycamore. Illinois 03/23/2020 04/24/2020
Bridge joint replace/repair, bridge deck repairs to SN 057-0022 and 057-0023. Illinois 03/23/2020 04/24/2020
Centerline joint repair and patching project on US 20 that starts at Plank Rd and extends E for 7.4 miles to a point approximately 80 ft W of the centerline of Shales Pkwy. Illinois 03/23/2020 04/24/2020
Smart Overlay and ADA improvements on US 12 from IL 19 to N of US 20. Illinois 03/23/2020 04/24/2020
Bridge painting along the I-39 corridor in Woodford County on SNs 102-0058, 102-0059, 102-0060, 1020061, and 1020062. Illinois 03/23/2020 04/24/2020
4.9 miles of milling, resurfacing, bridge repair and bridge joint repair on I-55 from north of the Glenarm interchange to 0.2 miles south of the Lake Springfield Bridge, and on East Lakeshore Drive fr Illinois 03/23/2020 04/24/2020
Deck slab repair, approach slab repair and expansion joints repair on SN 059-0013 carrying IL 111 over Lick Creek and SN 059-0014 carrying IL 111 over Bear Creek. Illinois 03/23/2020 04/24/2020
Driving lane inlay on FAI 74 approximately 1.3 miles W of Champaign County Line to 0.2 mile W of IL Rte 47 in Mahomet. Illinois 03/23/2020 04/24/2020
Ramp metering along the entrance ramp from Fayette St to Eastbound I-74 in Peoria. Illinois 03/23/2020 04/24/2020
Construct PPC sidewalk along Wall Street from 15th Street to 4th Street in Beardstown. Illinois 03/23/2020 04/24/2020
SMART overlay, ADA improvements, and milled rumble strips on IL 47 from IL 64 to Seavey Rd. The net length of this project is approximately 7.9 miles. Illinois 03/23/2020 04/24/2020
Resurfacing, ADA ramp improvements, signal improvements and geometric design improvements on US 54 / IL 106 through Pittsfield. Also includes pavement patching at the Pittsfield Weigh Station. Illinois 03/23/2020 04/24/2020
Culvert replacement on Old US 36 from east of the Scott / Morgan County line to east of Jacksonville. Illinois 03/23/2020 04/24/2020
Bridge Deck Overlay and Bridge Repairs on I-57 over Little Calumet River in Dixmoor. Illinois 03/23/2020 04/24/2020
Patching at various locations throughout District 8 Illinois 03/23/2020 04/24/2020
9,508 FT Construction and widening the Kennedy mainline Expwy NB from Roosevelt Rd. to Lake/Madison Sts, construction/rehab. of 10 ret. walls total, lighting, ITS, interstate resurfacing from the nort Illinois 03/23/2020 04/24/2020
Guardrail replacement at various locations throughout Greene County. Illinois 03/23/2020 04/24/2020
Removal and replacement of the culvert, constructing a new culvert under a driveway, filling existing culvert under roadway, guardrail removal and replacement. (SN 099-0450,SN 099-0441) Illinois 03/23/2020 04/24/2020
HMA Design Overlay of Touhy Ave from 240 ft W of the intersection of Lee St, E to 100 ft E of US-14. Illinois 03/23/2020 04/24/2020
Weed spraying along I-64, I-55, I-55/70, I-255 and IL 255 in District 8. Illinois 03/23/2020 04/24/2020
Resurfacing on IL 61 from IL 336 to CH 24 in Colmar. Illinois 03/23/2020 04/24/2020
Bridge deck repairs, joint replacement and deck overlay on IL 161 at Walnut Street and ICG/BandN RR (SN 061-0079). Illinois 03/23/2020 04/24/2020
Pavement marking on various routes in various conties in District 6. Illinois 03/23/2020 04/24/2020
Bridge repair, joint repair and deck overlay on Lebanon Road over Schoenberger Creek, west of IL 161 (SN 082-0258). Illinois 03/23/2020 04/24/2020
7 miles of patching, milling, resurfacing, aggregate shoulders and shoulder rumble strips on IL 49 from just south of Tyler Avenue in Casey to the Cumberland County line. Illinois 03/23/2020 04/24/2020
17.1 miles of patching on I-70 from 3.2 miles east of the Bond County line to the Brownstown Weigh Station. Illinois 03/23/2020 04/24/2020
Replace the bridge carrying Wilderness Retreat Road over Cooper Creek, 3.0 miles west of Mill Creek. Illinois 03/23/2020 04/24/2020
Resurfacing CH 7 from the Christian County line to Nokomis Blacktop. Illinois 03/23/2020 04/24/2020
Construction of a raised median, sidewalk replacement, curb and gutter, flashing beacons, pedestrian push buttons and pavement markings on IL 17 from Orchard Road to Hunter Avenue in Kankakee. Illinois 03/23/2020 04/24/2020
Bridge deck sealing on various bridges. Illinois 03/23/2020 04/24/2020
Resurfacing and sidewalk replacement on Lew Street from Church Street to Main Street in the city of Plano. Illinois 03/23/2020 04/24/2020
Washing and sealing the bridge deck on SN 093-0021 carrying IL 15 over the Wabash River in Mt. Carmel. Illinois 03/23/2020 04/24/2020
Resurfacing Seven Hills Road from O'Fallon Troy Road to State Street in the City of O'Fallon. Illinois 03/23/2020 04/24/2020
Bridge repair, bridge joint repair, and bridge deck overlay on the structure carrying Ashland Ave at Cal Sag Channel in Blue Island. Illinois 03/23/2020 04/24/2020
0.5 miles of resurfacing on IL 160 from 0.1 miles south of Trestle Road to US 40 in the City of Highland Illinois 03/23/2020 04/24/2020
Installation of radar detection at the intersection of IL 149 / IL 127 and 5th Street in Murphysboro. Illinois 03/23/2020 04/24/2020
Airfield Pavement Maintenance including Crack Sealing and Re-Marking Illinois 03/23/2020 04/24/2020
Bridge removal, roadway widening and sidewalk improvements on Pulaski Road at Ford City Drive in the City of Chicago Illinois 03/23/2020 04/24/2020
Rehabilitate Runway 18/36 lighting circuits Illinois 03/23/2020 04/24/2020
Replacement of traffic signal mast arms at various locations in Peoria and Tazewell Counties Illinois 03/23/2020 04/24/2020
2.88 miles of HMA cold-in-place, milling and resurfacing along US Rte 24 in Lewistown with minor drainage work and ADA requirements. Illinois 03/23/2020 04/24/2020
4.8 miles of cape seal with bump removal and patching on US 50 from Beaver Pond Ditch to the Indiana state line. Illinois 03/23/2020 04/24/2020
Resurfacing, curb and gutter replacement, sidewalks, pavement markings on Pearl Street from the Kansas City Southern Railroad tracks to Humbert Road in Godfrey Illinois 03/23/2020 04/24/2020
Rehabilitate the bridge carrying CH 6 over Salt Creek, 2.0 miles north of Chestnut Illinois 03/23/2020 04/24/2020
Dead tree removal along expressway and arterial routes of District One. Illinois 03/23/2020 04/24/2020
Weed spraying at various locations within District One Illinois 03/23/2020 04/24/2020
Construction of a PCC multi-use path, curb and gutter, culvert extension, storm sewer and pavement markings. Located on the east side of IL 83 from Bryn Mawr Avenue to Foster Avenue in Bensenville. Illinois 03/23/2020 04/24/2020
Improvements to bridge parapet, joint, steel, and wingwall on I-55 over BRC RR in Chicago Illinois 03/23/2020 04/24/2020
Districtwide smart work zone technology. Illinois 03/23/2020 04/24/2020
Bridge deck repairs and shoulder reconstruction on I-55 over IL 53, Joliet Rd, and S Madison St in Bolingbrook and Burr Ridge. Illinois 03/23/2020 04/24/2020
Repair to ramps on I-474 at Airport Rd and US Rte 24 interchanges in Peoria. Illinois 03/23/2020 04/24/2020
Obstruction Evaluation, Obstruction Removal, and Runway Threshold Remarking Illinois 03/23/2020 04/24/2020
Resurfacing, sidewalk replacement, and pavement markings on various routes in City of Dixon Illinois 03/23/2020 04/24/2020
Designed overlay including milling and resurfacing, installation of shoulder rumble strips, and other safety and drainage improvements along I-90 from IL 43 to I-94. Illinois 03/23/2020 04/24/2020
Sidewalk removal and replacement including ADA ramps on various routes in the City of Colchester Illinois 03/23/2020 04/24/2020
Sidewalk replacement and construction, and pavement martings at various locations in Mazon. Illinois 03/23/2020 04/24/2020
Bridge deck overlay of FAI 39 from 2100 N to 2200 N at Hudson Illinois 03/23/2020 04/24/2020
Roadway Construction and ramp rehab. Includes replace. concrete deck, bearings expansion joint and wingwalls. Substructure will be repaired. Project 3,709 LF. , Project 3,709 LF. Roadway reconstructio Illinois 03/23/2020 04/24/2020
Construction of 7" PCC pavment on Highland Avenue from Lincoln Street to Rector Avenue and on Rector Avenue from Highland Avenue to Mefford Drive in Robinson. Illinois 03/23/2020 04/24/2020
Bridge replacements under mattis ave. NW of Champaign. Illinois 03/23/2020 04/24/2020
Deck repairs on SN 085-0004 carrying IL 103 over Town Branch and SN 085-0005 carrying IL 103 over Crane Creek. Illinois 03/23/2020 04/24/2020
Culvert replacement from 1.8 miles north of the Brown / Pike County line to 0.5 miles south of the Brown / Pike County line. Illinois 03/23/2020 04/24/2020
23.5 miles of HMA surface removal, HMA surface course, HMA binder course, PCC sidewalks, paint pavement marking and raised reflective pavement markers on IL 127 from IL 146 in Jonesboro to IL 3 in Ale Illinois 03/23/2020 04/24/2020
25.55 miles of patching Macon/DeWitt to 2.9 miles S of I-74/US 51 interchange. Illinois 03/23/2020 04/24/2020
There are no open bids at this time. Get notified when agencies post matching bids by registering now.
301 - 400 of 710 results found