Provide all labor, equipment, and materials necessary for the installation of 10” raw water main on the Well No. 8 and Well No. 14 sites to tie the new Well No. 14 into the Well No. 8 Water Treatment Plant. Efforts shall be coordinated with the limits of the “Ohio Avenue and Kautz Road Raw Water Main” project, which will occur simultaneously. The project will include replacement of the existing 2400V utility service with a new 480V service to allow for replacement of the Well No. 8 pump and associated piping and electrical equipment. Additional project scope includes installation of a new well pump and column pipe assembly for both Well No. 8 and Well No. 14, including electrical and control-related appurtenances. Improvements to the existing water treatment facility include rehabilitation to HMO filtration and ion exchange softening processes along with valves, pumps, piping, instrumentation, electrical, and control-related replacements. Improvements to the existing Booster Station at the Well No. 8 site include replacement of roofing, exterior wall façade, HVAC equipment, electrical equipment, and piping appurtenances. Miscellaneous site work shall include pavement rehabilitation, sidewalk replacement, improvements to the existing plant beds, lighting replacement, and storm sewer modifications; along with incidental landscaping and site restoration.