The district is building a new fieldhouse at its south campus. Included in the fieldhouse is a 200 meter track and weight lifting room. The flooring is included in the construction costs and therefore not needed in this bid. Additionally, the current weight room is being refurbished into a Wellness Center. The weight room is used for weightlifting for PE and football. The wellness/fitness center is used for cardio equipment and resistance band machines. The 200-meter track is used for PE, track, and community walking. This request for proposal will allow various bidders to bid for all or a portion of the project. a. The successful bidder shall review the drawings contained herein and shall provide the district with a proposal that best meets the district needs. b. The bid shall include drawings (both 2 and 3 dimensional) of the new layout of the room(s) with recommended placement of the equipment (to scale). The district is open to receiving proposals that present various options/brands at various cost levels. c. The bid shall include separate line items for the cost of the equipment, shipping, and the installation. d. The bid shall include lead time for ordering and shipping. Additionally, the bid shall contain an affirmative statement whether the bidder can deliver and install said equipment prior to August 1, 2026 if awarded said bid at the January 21 Board meeting.