TECHNICAL SPECIFICATIONS Shelter Roof Removal and Replace: This work consists of removing an existing shelter roof & deck completely and replacing with Primary Roof Deck: Factory Pre-Stained Tongue & Groove and the Secondary Roof System “R” Panek Metal Roofing. The quote for this item shall reflect the price per T & G Decking and the Metal Roof. Exhibit photo is located on page 3 of this RFQ of the existing shelter roof approximately 26’ x 20’. Industry Standards: Reference CSI 2020 MasterFormat TM Division 10 Specialties Manufacturers category 7300 (protective Covers) Roofing Materials: 1. Primary Roof Deck: Factory Pre-Stained Tongue and Groove (TG) a) T & G shall be of 2 x 6 tongue & grove, Hem Fir, Select Structural KD15, Factory Stained, Color picked by District Representative. b) Manufacturer shall supply 30 pound felt & drip edge if both primary and secondary roofs are being supplied by the manufacturer. c) Contractor shall cut T & G down to required lengths. 2. Secondary Roof System: “R” Panel Metal Roofing (MR) a) Roofing shall be 24-gauge ribbed galvalume steel sheets, with ribs 1 3/16” high and 12” on center. b) Roof Surface shall be painted with Kynar 500 to the manufactures standard color chosen by District Representative. c) Roof panels shall be factory precut to size and angled to provide ease of one-step installation. d) Metal roofing trim shall match the color of the roof and shall be factory made of 26-gauge Kynar 500 painted steel. e) Trim shall include panel ridge caps, hip caps, eave trim, splice channels, rake trim, roof peak cap, and corner trim as applicable for model selected. Trim may need to be cut to length and notched. Installation drawings shall have detailed information on how to cut and affix the roof trim. f) Ridge, hip, and valley caps shall be pre-formed with a single central bend to match the roof pitch and shall be hemmed on the sides. g) Roof peak cap shall be pre- manufactured. h) Manufacturer shall supply painted screws. Execution: Installers Storage & Handling 1. Protect building products after arrival at destination from weather, sunlight, and damage. 2. Installer shall store product elevated to allow for air circulation and to not introduce mold, fungi decay or insects to the product. 3. The secondary roof shall be installed immediately after the primary roof to prevent moisture damage to the wood.