1 General Conditions including Bonds and Insurance 1 LS $ $ 2 Site Preparation, Removals & Earthwork 1 LS $ $ 3 Undercut, Haul Off and Placement of PGE at Trail (to be used only with approval of Owner's Representative) 12 CY $ $ 4 Silt Fence 605 LF $ $ 5 Inlet Protection 6 EA $ $ 6 Stabilized Construction Entrance 1 EA $ $ 7 Temporary Concrete Washout during entire project 1 EA $ $ 8 Private Utility Locates 1 LS $ $ 9 As-Built Topographic Survey prepared and sealed by an Illinois licensed surveyor (to be used only with approval of Owner's Representative) 1 LS $ $ 10 Asphalt Paving - Trail Patch 503 SF $ $ 11 Asphalt Paving - Trail Patch (to be used only with approval of Owner's Representative) 1 SY $ $ 12 Asphalt Paving - Trail 163 SY $ $ 13 Asphalt Paving - Crack Fill 331 LF $ $ 14 Asphalt Paving - Crack Fill (to be used only with approval of Owner's Representative) 8 LF $ $ 15 Asphalt Paving - Crack Seal 979 LF $ $ 16 Asphalt Paving - Crack Seal (to be used only with approval of Owner's Representative) 8 LF $ $ 17 Asphalt Paving - Seal Coat 2038 SY $ $ 18 Concrete Paving 5417 SF $ $ 19 Integral Curb at Walk 56 LF $ $ 20 Curb at Playground - 12" Wide 201 LF $ $