The waste line from the kitchen sink to the main stack in the basement will need to be completely replaced. Currently the line is separated in the basement discharging grey water on the furnace. This replaced line will need correct slope and supported in accordance with plumbing codes. There is a cellar door on the exterior on the home with concrete steps leading to the basement. This door is decaying plywood. Remove the plywood and replace with a set of primed metal Bilico Doors that can be locked from the inside. Follow manufactures instructions for installation. Measurements for the door must be verified by the contractor before ordering making sure a custom fit when installing the doors on the concrete walls. Remove existing roof on the house down to sheathing. Replace any rotted or damaged wood. If this is old slat sheathing with gaps larger than ½” then osb or plywood may need to be installed as a substrate in accordance with shingle manufacture’s instructions. Ice and snow guard must be installed per code and water barrier over remaining roof, if using traditional felt paper 30 lbs. minimum requirement. Use 2” style D roof edge. Install new flashing over plumbing boots, mast, and flues. Shingle’s will be a minimum of 35 year manufactures warranty. Color selection will be decided by the homeowner from a color selection the contractor shall provide at the preconstruction meeting. Install new step flashing, head flashing, & counter flashing as needed. Flashing must be tucked behind siding leaving a water tight seal at roof lines to wall lines. Remove center sheathing along the peak to manufacture’s specifications for a shingle over ridge vent. Install new the entire length of the peak on the house, not to encroach into the overhangs. Install new 6” seamless gutters throughout the building’s roof lines. Including the Shed roof on the West side of the building. Install new 5” downs and hinged tail pipes 4’ from the foundation. Straps for the downs every 8’ of straight sections two straps minimum per run. Two color matching metal screws per fitting. Gutters are now being permitted and inspected per City ordinance. Permits require before work begins.