Remove the chimney from the roof down below the roof line. Making sure that there is a liner that pulls the flue gases from the basement out through the roof. Install new galvanized pipe, flashing, storm collar, and weather cap. Some framing maybe needed along with sheathing covering the old area from the existing chimney. Remove all the satellite brackets off the roof. No brackets or Dish will need to be installed back on this roof. Remove existing shingles from the roof down to the roof sheathing. Check for excessively wide gaps in the roof planking. Ice and snow guard in all the valleys and lower edges of the roof line. This must cover 2’ higher than the exterior plate line. Approved water barrier over the remain roof sheathing. Install new 2’ style D roof edging throughout. Install 35- year architectural shingles of the homeowner’s choice. Install a shingle over ridge vent following manufacture’s instruction. Allow maximum cut back of the ridge line for ventilation. Install new plumbing flashing boots, extend the plumbing vents if less the 12” on the shallow side. Patch all the turtle vent holes with approved sheathing material. Install all head flashing and new step flashing at the wall lines.