Specifications include, but are not limited to: Remove layer of shingles down to sheathing. Repair any sheathing damage. Ice and snow must be used accordance to building codes. Install water barrier over remaining roof sheathing. Install new 35-yr architectural shingles per homeowner color choice supplied by the contractor’s suppliers. Owens Corning is the preferred brand. New 2” D style roof edge, plumbing boots, electrical mast flashing boots, and new attic vents. Ridge vent shingle over is preferred over turtle vents. Remove the siding on the two dormers on the front so proper flashing can be installed around the sides and face under the window. After the roof is completed install new vinyl siding on the dormers using the closet color match to siding below the roof. Install soffit and break metal fascia on both dormers. Permits required before work starts.