Scope consists of 2” milling of existing hot-mix asphalt and replacing with 1.5” of HMA Surface Course and 0.75” of Polymerized HMA Binder Course, Class and D Patches, curb and gutter removal and replacement (as necessary), sidewalk removal and replacement (as necessary), detectable warnings (ADA accessibility), delineator installation, structure adjustments, pavement striping, pavement imprinted crosswalks, detector loop replacement (as necessary), watermain and sewer replacement (to be paid for with 100% local funds), restoration and all other incidental and collateral work necessary to complete the project as shown on the plans and described herein. All saw-cutting shall be included in removal items and shall be performed prior to beginning removal.