The project measures 675 feet (0.127 miles) along the centerline of E 11th Street. DESCRIPTION OF WORK The project corridor for Section 19-00137-00-BR begins at Station 16+75 west and extends easterly to Station 23+50. The proposed work consists of removing the existing three span (27’-3”; 37'-6"; 27'-3") concrete slab structure built on pile supported abutments and piers with concrete encasement and replacing with a three span (33'-6", 37'-6",27'- 9") concrete slab structure. The project includes improvements to the roadway profile, pedestrian path, path connector, curb and gutter, aggregate subbase, erosion control, pavement markings, etc. for approximately 300ft east and west of the structure under full road closure. GENERAL The Contractor shall cooperate with landowners and tenants regarding access to private property, as well as the U.S. Post Office for mail delivery and Republic Services for removal of garbage. All existing street and traffic signs in conflict with the proposed reconstruction shall be removed, safely stored, and re-installed by the Contractor as directed by the Engineer. Cost shall be incidental to this contract. Contractor shall take care to minimize disturbed areas with construction equipment. Any areas disturbed outside the Plans will be re-graded, repaired, and re-seeded at the Contractor’s expense. This work shall be considered incidental to the contract. No additional compensation will be made for repair to any damaged turf areas outside the construction zones. Saw Cuts shall have a neat and squared appearance and are considered incidental to the contract. No additional compensation will be made. Manholes and Valve Boxes to be adjusted that are within the pavement shall have concrete used as fill and have a diamond-shaped appearance as shown in the Plans and as specified in these Special Provisions.