Removal of existing twin concrete box culverts and construction of a new precast prestressed concrete deck beam bridge with approaches 1.5 miles east of Trilla over Muddy Creek involving: 1 LUMP SUM TRAFFIC CONTROL & PROTECTION, (SPECIAL); 38 UNITS TREE REMOVAL (6 TO 15 UNITS DIAMETER); 32 UNITS TREE REMOVAL (OVER 15 UNITS DIAMETER); 138 CUBIC YARDS EARTH EXCAVATION; 190 CUBIC YARDS CHANNEL EXCAVATION; 120 TON POROUS GRANULAR EMBANKMENT; 310 TON STONE DUMPED RIPRAP, CLASS A4; 299 TON AGGREGATE BASE COURSE, TYPE B; 1 EACH REMOVAL OF EXISTING STRUCTURES; 23.4 CUBIC YARDS CONCRETE STRUCTURES; 9.3 CUBIC YARDS CONCRETE ENCASEMENT; 1,368 SQUARE FEET PRECAST PRESTRESSED CONCRETE DECK BEAMS (27" DEPTH); 2,940 POUND REINFORCEMENT BARS, EPOXY COATED; 114 FEET STEEL RAILING, TYPE S1; 160 FEET FURNISHING STEEL PILES HP 10X42; 100.5 CUBIC FEET DRILLING AND SETTING PILES (IN ROCK); 1 EACH NAME PLATES; 1 LUMP SUM MOBILIZATION; 4 EACH TERMINAL MARKERS-DIRECT APPLIED