The project consists of furnishing all labor, equipment and materials necessary for removal and replacement of stormwater pipe culverts, curb inlets and manholes, riprap outlet protection, asphalt milling and pavement resurfacing, property and fence restoration, and any incidentals necessary to complete the project. 12 cu yd REM & DISP UNS MATL 215 sq yd STONE RIPRAP CL A3 249.4 BIT MATLS TACK CT 39.8 ton HMA SC IL-9.5 C N50 5.1 sq yd PCC DRIVEWAY PAVT 6 554 sq yd HMA SURF REM 1 1/4 6.2 sq yd DRIVE PAVEMENT REM 85 foot COMB CURB GUTTER REM 310 foot PIPE CULVERT REMOV 70 foot P CUL CL A 2 18 136 foot P CUL CL A 2 24 104 foot P CUL CL A 2 36 1 each PRC FLAR END SEC 18 1 each PRC FLAR END SEC 36 1 each MANHOLES, TY A, 6'-DIA. 1 each INLETS TB T15 F&L 5 each REMOV INLETS 93 foot COMB CC&G TM4.12 1 l sum MOBILIZATION 1 l sum CLEARING AND GRUBBING 1 l sum TRAF CONT & PROT SPL 1 l sum RESTORATION COMP 1 l sum EROSION CONTROL 1 l sum FENCE REM AND REINSTALL 1 each INLETS SPL N1 1 each MANHOLE, 6'-DIA. TY 8 GR, SP 1 l sum TOPSOIL PLACEMENT