The work on this project at S.N. 032-9006 consists of construction of temporary runaround structure, reconstruction of substructure and superstructure of S.N. 032-9006, temporary soil retention, installation of protective shielding, pavement reconstruction, median concrete barrier and guardrail replacement, and maintenance of traffic along the roadway to the east and west of the structure, and any other work necessary to complete the project. The work on S.N. 032-0065 consists of removing portions of the existing deck and curbs to replace expansion joints, ¾” scarification, 2 ¼” latex concrete overlay, clean and paint existing bridge rail, new steel railing inside existing rail to upgrade existing guardrail connections at all four corners, raise pier walls to 5’-0” above ground elevation, HMA butt joints over existing approach pavement, new guardrail and aggregate shoulders and any other work necessary to complete the project.