Specifications include, but are not limited to:The Work of Project is defined by the Contract Documents and consists of the following: 1. Basement: a. Remove limited areas of drop ceiling and install new drop ceiling. b. Remove limited areas of floor tile and install new flooring and base. c. Remove select walls and add new walls. d. Remove existing domestic water and install new from basement to Mechanical room. e. Move existing exercise equipment in basement up to 6th level Exercise room. f. Remove existing plumbing fixtures and install new. g. Remove existing lockers, place in Sally Port, and provide new lockers. h. Provide new electrical panel and power to new lockers. i. Remove existing HVAC grills and provide new HVAC grills. j. Remove existing Kitchen counter and sink and provide new counter and sink. k. Remove existing Kitchen casework hardware and install new. l. Paint existing Kitchen casework. m. Paint walls, doors, door and window frames. 2. 4th level (Main): a. Remove existing brick, create opening for new window in Police Chief’s office. b. Remove limited areas of drop ceiling and install new drop ceiling. c. Remove existing Lobby polycarbonate glazing and install new ballistic resistant system. d. Remove existing doors and security access hardware for reuse in new openings. e. Install new walls and door frames to utilize existing door and security access hardware. f. Paint walls, doors, door and window frames. g. Clean and seal existing terrazzo flooring. h. Remove existing exhaust vent and provide new hood exhaust vent. 3. 6th Level: a. Remove existing CMU walls without disturbing floor tile. b. Remove existing plumbing fixtures. c. Remove existing plumbing lines and cap. d. Remove and relocate existing thermostat. e. Remove existing mosaic flooring, patch and level floor as necessary. f. Move exercise equipment from basement into new Exercise Room.