The project consists of sealcoating, crack filling and striping of multiple parking lots at locations within city limits. Location #1 - Lot W located at 309 N. River St – PIN# 15-22-178-010 94,980 sq. ft of asphalt surface 266 total parking spaces total 7 handicap parking spaces Up to 1,000 feet of crack fill The allowed hours of work are between 7:00 AM and 7:00 PM, Monday through Thursday Equipment shall not be started before 6:45 AM. Location #2 Pinney St. parking spaces – parking area east of 102 N. River St 4,650 sq. ft of asphalt surface 18 total parking spaces 0 handicap parking spaces Up to 100 feet of crack fill The allowed hours of work are between 7:00 AM and 7:00 PM, Monday through Friday, and between 8:00 AM and 5:00 PM on Saturdays. No work shall be done on Sundays or Holidays. Equipment shall not be started before 6:45 AM. Location #3 Lot F located at 39 E. New York ST – PIN 15-22-331-027 10,560 sq ft of asphalt surface 36 total parking spaces 1 is a handicap parking space 2 additional no parking striped areas Up to 300 feet of crack fill