Tenders are invited for the work consisting of furnishing all materials, labor, and equipment required to: 1. Remove existing Engineering Field Office (“Construction Trailer”) and cap existing utility connections. 2. Demolish existing pipe supports and install new pipe supports for 36-inch diameter discharge pipes from Raw Sewage Pumps #1, #2 and #3 in the North Pump Well of the Influent Pumping Station. Where compression-type joining devices are currently used at two locations per discharge pipe, install welded pipe sleeves to permanently join separate sections of discharge piping. 3. Demolish and replace hydraulic piping, hoses, and appurtenances between the control cabinet and all three discharge valve actuators in the Influent Pumping Station North Pump Well. 4. Repair of 6-inch drain pump suction and discharge pipe connections to the Wet Well wall within the North Pump Well pump room. 5. Perform concrete repairs in the North Pump Well pump room. 6. Install new debris basket safety restraints and OSHA-compliant anchor points at the top of the Coarse Screen Well inside the Influent Pumping Station. 7. Perform all other work as specified in the Specifications and as shown on the Plans, including all incidental work.