Work includes exterior rehabilitation of existing 1,000,000 gallon welded steel with concrete pillar/column base composite elevated water storage tank including full containment; low pressure water cleaning of exterior steel portion of the tank to remove mold and mildew; sandblast cleaning and painting exterior steel portion of the tank; apply exterior logo / lettering on exterior steel portion of the tank; removal and proper disposal of waste; removal and replacement of existing interior mud valve on tank drain pipe with freeze proof drain valve; cleaning debris from behind existing overflow pipe outlet screen; replacement of existing interior light bulbs in the dry access tube with LED light bulbs; relocation of existing coax cables attached to interior ladders and attach to new interior ladder standoff supports to comply with OSHA and AWWA standards; protect all existing cables, antennas, and aviation light on the top of the tank with all antennas and aviation light remaining in service at all times;