Contractor shall provide all labor, equipment, and materials for the Illinois State University Cook Hall (CH) 208 & 210 Data Room Cooling project. A heating single prime will serve as the general contractor for the project with the expectation to subcontract all other work outside of the heating scope. Work includes, but is not limited to, the following: Demolish (3) existing DX fan coil units, ductwork, refrigeration piping, electrical wiring and grade mounted condensing units. Patch all surfaces to match adjacent. Determine existing heating load and add 15% additional capacity for a new mechanical cooling system with N+1 capacity that serve both CH 208 and 210. Unit to be ducted, free standing (horizontal or vertical) and the location shall be coordinated with the existing racks and wiring. Controls provided and installed by ISU. Both spaces shall re-use existing LED lighting. Existing ceiling grid and tile shall be removed in CH 208 and not reinstalled. Relocate existing fire alarm devices and fire suppression nozzles as required. The ceiling in CH 210 is exposed and shall remain unchanged. Each room shall be pressure tested individually for the chemical fire suppression system. The existing fire suppression systems shall be verified that they are adequate to serve their respective spaces. Each space shall activate individually and shall be isolated from the other. Server equipment will remain in operation during project so protection and adequate temporary cooling must be maintained.