Scope of work includes (but is not limited to): Section 1 – Cabling of facility A) Labor and material to install fiber backbone cabling – 1) From MDF to IDF on main level 2) From IDF to Maintenance Building 3) From IDF to Water Building 4) Provide and install fiber housings, connector panels and all fusion splicing of LC connectors 5) Provide necessary LC to LC 1M SM fiber patch cords B) Provide and install all new network cabinets & racks at 4 (new) IDF locations 1) New Quad rack 45RU 4 post server style rack in the MDF with vertical managers 2) New all mounted rack in new IDF 1 location on 1st floor 3) New wall mounted rack in maintenance building 4) New wall mounted rack in water building 5) Provide and install 18” ladder rack and ladder rack support brackets in MDF for cable management 6) Provide and install fire rated plywood behind IDF’s and on walls of MDF C) Provide and install up to (230) Cat6A cables for network locations, phone locations, AP locations, camera locations and any other network device within the main building, maintenance shop and water building. D) Provide and install (4) APC UPS’s for the battery backup of system E) All cables to be Fluke tested for accuracy and machine labeled for identification.