14 individual building quotes should include all labor and materials to perform the following: Gutters: • Contractor to provide pricing for acceptable finished guttering work that meets the following criteria: • Buildings to have 5” seamless gutters with 3”x 4” downspouts. • Use two straps (per standard recommendation) per downspout. Straps can be wrap around or side mount but should have a factory finished edge (no sharp, unfinished edges from trimming). • Downspouts are to be Three by Four inches with elbows at the bottom to divert water away from the building. Downspout length with elbow is to extend to within four inches of grade level and must be plumb. • For buildings that have Downspouts that run into PVC piping on the side of the building, the PVC piping is to be removed and the new downspout installed...