Specifications include, but are not limited to: Remove existing roofing material down to expose the roof sheathing. Examine for wood rot or damage sheathing and replace as needed. Remove the existing brick chimney completely from roof to through the basement. Field frame in the opening in the first floor and where the roof penetration is. Install Ice and Snow guard in the valleys and along the lower perimeter of roof edge following manufactures instructions. Install water barrier over the remaining roof. Install shingle over ridge vents, relief cutting the ridge per manufactures instructions allowing the maximum air flow. Install new plumbing flashing boots, new 2” white style D roof edge, and 30-year architectural shingles in The City’s choice of color. Remove all the existing Aluminum siding, soffit, and fascia. Install approved house wrap, taping all the seams. Install new double 4” vinyl siding in The City’s choice of color. Install light blocks at the entry door locations. Install split trim blocks at all receptacle, plumbing Flue, gas meter, or any other exterior wall penetrations. Install new aluminum F channel, center vent soffit on the over hangs, solid soffit on rake eves, and white fascia. Use matching siding calk to seal any areas exposed to the weather. Install new seamless gutters, downs, and tail pipes 4’ away from the foundation. Install flip up tailpipes at the elbows eliminating any chances of the wind blowing them away. Install 2 straps securing the downs to the house wall. Inside the front porch leave the existing storm windows intact, encapsulate frames in white break metal. Leave the bead board on the ceiling intact. Siding the twohouse exterior walls with the same exterior siding.