The project consists of approximately 1,775 feet of 10-foot-wide bike trails constructed with hot-mix asphalt surface pavement. The project also includes installation of culverts, signage, bollards, excavation for compensatory floodplain storage, topsoil stripping for reuse and topsoil furnish and placement, tree removal, seeding, erosion control blanket installation, thermoplastic pavement markings, and all incidental work necessary to complete the project as shown on the plans and as described herein. The project local agency and Owner is the Plainfield Township Park District. The grading plan includes fill in the 100-year floodplain and floodway of the DuPage River and requires compensatory storage, as shown in the plans.