Specifications include, but are not limited to: The project consists of the resurfacing of Windsor Dr from Dryden Ave/Jane Ave to south of Hintz Rd, a distance of approximately 58,00 ft, or 1.1 miles. Windsor Drive currently consists of a twolane urban cross section from Dryden Ave/Jane Ave to Lillian Ln and then opens to a four-lane urban cross section from Lillian Ln to Hintz Rd, with dedicated turn lanes at the Palatine Rd Intersection. Between Palatine Road and Crabtree Drive, a Road Diet is proposed to modify the 4‐ lane cross section to provide one lane in each direction, a center landscaped median/left turn lane, and on‐street buffered bike lanes. The sidewalks north of Palatine Road will be widened to 8 feet wide to provide a consistent width within the corridor.