The consultant will be expected to provide a full range of engineering services and accept project management responsibility at all levels. All work shall be completed using the latest AASHTO, IDOT and City of Oak Forest and Cook County design and construction standards, guidelines, practices and procedures. Project Standards, Guidelines and Specifications: The following is a general list of technical references that may be applicable to this project. The Consultant will be responsible for complying with the current editions of the listed references. Illinois Department of Transportation – Standard Specifications for Road and Bridge Construction. ADA Accessibility Guidelines. Manual on Uniform Traffic Control Devices (MUTCD). Standard Specifications for Water & Sewer Main Construction in Illinois. Illinois Urban Manual.