A. Generator Disconnection and Removal The Contractor shall: • Disconnect and remove the existing emergency feeders between the generator and the adjacent generator distribution panel. • Disconnect existing start/stop control wiring and pull wiring back to the nearest accessible junction box. • Disconnect shore power circuits and pull wiring back to the nearest accessible junction box. • Provide all labor and equipment to remove the existing generator set from the concrete pad. • Coordinate with appropriate stakeholder(s) for proper possession and disposal of the existing generator set. B. Concrete Pad Preparation and Mounting The Contractor shall: • Clean and prepare existing conduit and pad area to receive new generator equipment. • Form and pour new concrete generator mounting structures, raised 12 inches above the existing pad elevation, to support the new generator.