Deconstruct the existing masonry wall up to the existing roof above doors 16-17 on the East side of 100. E. Flessner Avenue, Rantoul IL (the building), along with existing lintels and other materials as necessary between the overhead doors as shown on the attached detailed drawing. - Provide appropriate support to remaining structure to maintain the integrity of the building - To Construct new steel lintels spanning the entire opening and connect them to the existing as shown in engineer drawing, as part of the bid documents. - To rebuild the wall with new metals studs and metal siding along with associated flashing improvements. - To ensure the siding installed is appropriate gauge metal, red in color – to be selected by the Village. - Contractor to provide and install two garage doors and associated track and side openers using proposal by Rocke Overhead Doors, see Appendix B. - To ensure wiring is installed to provide power to two side openers, to the 2018 National Electric Code - To ensure all construction meets the standards set forth in the villages adopted building codes - Exterior Sheathing: - Insulated R-19 with vapor barrier all exterior walls. - Exterior pre-formed steel panels. - PRODUCTS: 26 ga. “FABRAL” profiles and colors to be selected by the Village, OR equivalent product with Structural Engineer-of-Record approval. Contractor to remove existing doors and provide 22’-2” W by 14’ high Model 3216 Brown High Lift Door. Six 24”x12” windows with 3” track in steel. Top, side and bottom seals. H-751 L5 Liftmaster commercial heavy-duty hoist operator and remote. 110V operation.