Project Description: The CSAH 27 Pedestrian Conectivity Project seeks to enhance pedestrian and bicycle access, safety, and comfort in the southeastemportionof the community byconstructing a sidewalk and 10-foot-wide bituminous trail along Agency Street and 211th Street. The project includes the design of approximately5,00 feet of paved trail as part of the Eagle Lake sidewalks and trail network. A keyfeature of the project is a new pedestrian crosswalk flasher system at CSAH 27 and Thomas Drive, which willimprove crossing safety. The project will also deliver ADA-compliant infrastructure and eliminate existing gaps in the sidewalk and trail system, thereby promoting active transportation and community connectivity. FY26 construction with environmental work, design, and specs to be completed with a short turnaround time. 3. ScopeofServices The selected consultant shallprovide all labor, materials, and expertise necessary to complete the following: Project coordination and meetings with City staffand stakeholders Preliminary design and alternatives analysis for approximately 5,000 feet of trail and sidewalk Design ofpedestrian crosswalk flasher system at CSAH 27 and Thomas Drive ADA compliance reviewand integration Environmental documentation – a construction environmental documentmust be provided. Design services are restricted to no ground disturbance until construction. Cost estimating and phasing Final design and construction documents suitable for letting Coordination with MnDOT for federal compliance