The project consists of heating, ventilation, architectural and electrical renovations at Clark, Hall including selective demolition of existing wall and HVAC system. The new fan coil units in Clark Hall will be served by new piping risers originating from reverse-return loops at the second-floor ceiling. The new horizontal piping will be concealed in fabricated metal pipe chases along the walls. The project includes new electrical distribution and new building automation systems to serve the new fan coil units and mechanical room equipment. Various offices are to receive renovations including wall relocations, doors and ceiling modifications. The project also includes incidental work related to the HVAC installation, including asbestos and lead paint abatement, ceiling removal and replacement, lighting replacement, patching of existing surfaces, and limited fire suppression work.