Specifications include, but are not limited to: A. All identified sidewalk, driveway apron or curb shall be removed and replaced by the Contractor. All saw cutting shall be performed with a wet method. All slurry shall be removed after the saw cutting. B. Any additional gravel required for the underlying leveling course will be supplied as required and delivered to the work site by the Contractor and will be incidental to the contract. C. Contractor shall supply all material and labor to remove and construct the required sidewalk, driveway and curb, including forms consisting of slip forms for all sidewalk applications. A Grad-All will be required for the removal of all existing sidewalk, aprons, and curb and gutter. D. The contractor shall supply and be responsible for the placement of any required barricades or warning and safety devices. E. Contractor shall remove the construction forms and related debris from the job site after the sidewalk, driveway and curb has cured sufficiently to use, but no later than seventy-two (72) hours after finishing. No construction forms or debris shall be placed within the right of way.