CONSTRUCT. PAV'T RESURFACING WITH HOT-MIX ASPH. SURF. CSE., IL-9.5, MIX D, N50 (2,565 TON); POLY. HOT-MIX ASPH. BIND. CSE., IL-4.75, N50 (1,470 TON); HOT-MIX ASPH. SURF. REM. (25,390 SQ YD); COMB. CONC. C&G REM. & REPL. (2,680 FT); PCC SW. REM. & REPL. 5" (6,710 SQ FT); CLASS D PATCHES (800 SQ YD); THPL. PV'T. MRK (VAR. SIZES) (1,843 FT); ETC. (0.5 MILES) Bridge repairs including removal and replacement of the HMA wearing surface, PPC deck beam keyway repair, waterproofing membrane, and concrete backwall repairs. THE PROPOSED IMPROVEMENTS INCLUDE QUINCY STREET SIDEWALK AND CURB AND GUTTER REMOVAL AND REPLACEMENT ALONG THE NORTH OF THE VILLAGE HALL BUILDING. MID-BLOCK CURB RAMPS WILL BE CONSTRUCTED ON QUINCY STREET BETWEEN CASS AVENUE AND LINCOLN STREET. EXISTING CONCRETE PLATFORM AND ACCESS RAMP TO NORTH ENTRANCE OF VILLAGE HALL WILL BE REMOVED AND RECONSTRUCTED. REMOVAL AND RELOCATION OF EXISTING BRICK PAVERS. NEW ROADSIDE ITEMS TO BE INSTALLED CONSIST OF WAYFINDING SIGNAGE, PERMEABLE PAVERS, TREES AND PLANTINGS, AND ADDITIONAL LANDSCAPING.