1 Earth Excavation C.Y. 30 2 Parkway Restoration Lsum 0.10 0.03 0.03 0.01 3 Inlet and Pipe Protection Each 2423 4 Aggregate Base Repair, 10" S.Y. 35 14 23 3 5 Bituminous Materials (Prime Coat) Gal 350 140 230 30 6 Aggregate (Prime Coat) Tons 35 14 23 3 7 Hot-Mix Asphalt Binder Course, IL-9.5, N50, 1.25" Tons 8 Hot-Mix Asphalt Surface Cousre, Mix "D", N50, 1.25" Tons 9 Hot-Mix Asphalt Surface Course, Mix "D", N50, 2" Tons 425 175 275 50 10 Hot-Mix Asphalt, Hand Method Tons 11 P.C.C. Approach Pavement, 6" S.Y. 181 12 P.C.C. Approach Pavement, 8" S.Y. 13 P.C.C. Sidewalk, 4" S.F. 6,125 3,950 225 1,500 14 Detectable Warnings, ADA Ramps S.F. 20 80 20 15 Combination Curb and Gutter Removal L.F. 790 100 30 16 Sidewalk Removal S.F. 6,175 3,950 225 17 Approach Pavement Removal S.Y. 181 18 Surface Removal, 1.25" S.Y. 19 Surface Removal, 2" S.Y. 3,500 1,400 2,300 300 20 Surface Removal, Butt Joints S.Y.