Pay Item # UOM Description Type Quantity Unit Price 20100110 UNIT TREE REMOVAL (6 TO 15 UNITS DIAMETER) Base items 178.000 20100210 UNIT TREE REMOVAL (OVER 15 UNITS DIAMETER) Base items 134.000 20100500 ACRE TREE REMOVAL, ACRES Base items 2.000 20101000 FOOT TEMPORARY FENCE Base items 383.000 20101100 EACH TREE TRUNK PROTECTION Base items 13.000 20200100 CU YD EARTH EXCAVATION Base items 31,440.000 20201200 CU YD REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL Base items 3,225.000 20700220 CU YD POROUS GRANULAR EMBANKMENT Base items 790.000 20800150 CU YD TRENCH BACKFILL Base items 3,527.000 21001000 SQ YD GEOTECHNICAL FABRIC FOR GROUND STABILIZATION Base items 37,452.000 21101505 CU YD TOPSOIL EXCAVATION AND PLACEMENT Base items 1,620.000 25000300 ACRE SEEDING, CLASS 3 Base items 3.250 25000322 ACRE SEEDING, CLASS 5A Base items 4.500 25000400 POUND NITROGEN FERTILIZER NUTRIENT Base items 688.000 25000500 POUND PHOSPHORUS FERTILIZER NUTRIENT Base items 688.000 25000600 POUND POTASSIUM FERTILIZER NUTRIENT Base items 688.000 25000750 ACRE MOWING Base items 49.000 25000775 EACH SELECTIVE MOWING STAKES Base items 33.000 25100115 ACRE MULCH, METHOD 2 Base items 1.000 25200110 SQ YD SODDING, SALT TOLERANT Base items 3,159.000 25200200 UNIT SUPPLEMENTAL WATERING Base items 7.000 28000250 POUND TEMPORARY EROSION CONTROL SEEDING Base items 773.000 28000305 FOOT TEMPORARY DITCH CHECKS Base items 150.000 28000315 TON AGGREGATE DITCH CHECKS Base items 0.300 28000400 FOOT PERIMETER EROSION BARRIER Base items 4,464.000 28000500 EACH INLET AND PIPE PROTECTION Base items 92.000 28001100 SQ YD TEMPORARY EROSION CONTROL BLANKET Base items 33,968.000...