Specifications include, but are not limited to: installation of permanent protective shielding, ADA ramp construction, deck joint seal replacement, and various sidewalk, parapet and deck slab repairs, and traffic control and protection. Permanent protective shielding will be installed beneath the entire length of the Home Avenue pedestrian bridge deck. Concrete repairs will be performed on the sidewalks and parapets of the Oak Park Avenue bridge, including removal and replacement of sidewalk ramps. On East Avenue, the existing neoprene deck joint seal at the North end of the bridge will be removed and replaced with a silicone joint sealer and polymer concrete nosing. Bridge work will be performed in stages to maintain traffic over the bridges throughout construction. Nightime work is anticipated for portions of the improvement due to restrictions of lane closures on I-290.