1 100 - Mobilization / Job Set-Up 1 Lump Sum 2 101 - Traffic Control and Protection 305 Day 3 102 - Televised Inspection of Sewers and Sewer Structures 300 Linear Foot 4 113 - Test Hole 81 Each 5 129a - Replacement of Existing Sewer with Ductile Iron Pipe, 6- Inch Dia. 150 Linear Foot 6 129b - Replacement of Existing Sewer with Ductile Iron Pipe, 8- Inch Dia. 90 Linear Foot 7 129c - Replacement of Existing House Drain with PVC Pipe, 6-Inch Dia. 150 Linear Foot 8 129d - Replacement of Existing House Drain with PVC Pipe, 8-Inch Dia. 60 Linear Foot 9 135 - Water Main Quality PVC Drain Connection 6-Inch by Pipe Bursting 60 Linear Foot 10 143a - New Exterior Water Service, from the Water Main to the Roundway, Trenchless (1-inch) 230 Linear Foot