Specifications include, but are not limited to: The City of Elgin, Illinois, does hereby invite sealed bids for the Revitalization of DuPage Court at 20-43 DuPage Court, Elgin IL 60120. The Work shall be conducted in two phases in the following order, with each phase substantially complete before beginning the next phase: 1. Phase I: All underground utility work, all concrete foundations, provide temporary concrete pavement over work area through the winter. 2. Phase II: The remaining Work shall be substantially complete and ready for occupancy at time of Substantial Completion. Owner Occupancy of Completed Areas of Construction: Owner reserves the right to occupy and to place and install equipment in completed areas of building, before Substantial Completion, provided such occupancy does not interfere with completion of the Work. Such placement of equipment and partial occupancy shall not constitute acceptance of the total Work. 1. Architect will prepare a Certificate of Substantial Completion for each specific portion of the Work to be occupied before Owner occupancy. 2. Obtain a Certificate of Occupancy from authorities having jurisdiction before Owner occupancy. 3. Before partial Owner occupancy, electrical systems shall be fully operational, and required tests and inspections shall be successfully completed. On occupancy, Owner will operate and maintain electrical systems serving occupied portions of building. 4. On occupancy, Owner will assume responsibility for maintenance and custodial service for occupied portions of building.