The Village of Elk Grove Village will receive sealed bids for the rehabilitation of the sequencing equipment at the Elk Grove Village Splash Pad. The work includes the removal and replacement of the existing Crystal Fountains Choreoswitch and LED lighting assemblies, cleaning and reconditioning of existing junction boxes, and installation of new Choreoswitch units and associated electrical components. Existing control panel to be evaluated for modification, incorporation, and control of new splashpad animation controller including addition of all new necessary power and communication connections. The work further includes all testing, DMX addressing, grounding, and sealing necessary to ensure full operational functionality of the sequencing system, as well as all incidental and collateral work required to complete the installation;