1 Removal and Disposal of Unsuitable Material Cu-Yd 2 2 Seeding, Class 2A, Salt Tolerant Sq-Yd 2,457 3 Grading and Shaping Ditches Foot 2,110 4 Grading and Shaping Parkways Sq-Yd 281 5 Erosion Control Blanket Sq-Yd 2,457 6 3 Inch Lined Stone Ditch Foot 277 7 Sidewalk Removal Sq-Ft 675 8 Combination Curb and Gutter Removal Foot 89 9 Driveway Pavement Removal Sq-Yd 257 10 Portland Cement Concrete Sidewalk, 5 Inch Sq-Ft 825 11 Detectable Warnings Sq-Ft 40 12 Combination Concrete Curb and Gutter, M4.12 Foot 32 13 Combination Concrete Curb and Gutter, B6.12 Foot 139 14 Portland Cement Concrete Driveway, 6 Inch Sq-Yd 149 15 Portland Cement Concrete Flume Sq-Ft 45 16 Storm Sewer Removal 12" Foot 58 17 Storm Sewer Removal 15" Foot 30 18 Storm Structure Removal Each 3 19 Storm Sewer, PVC SDR 26, 10" Foot 8 20 Storm Sewer, PVC SDR 26, 12" Foot 61 21 Storm Sewer, PVC SDR 26, 15" Foot 30 22 Remove and Replace Driveway Culvert, 12” Foot 336 23 Parkway Culvert, PVC SDR 26, 12" Foot 50 24 Inlet, Type A, Type 8 Grate Each 1 25 Inlet, Type A, Type 1 Frame, Open Lid Each 1 26 Inlet, Type A, Type 11 Frame and Grate Each 1