This project consists of furnishing all work necessary for the completion of milling and hot mix asphalt overlay, along with necessary incidentals, on various streets in the Town of Normal, Illinois. The proposed improvement consists of the following approximate quantities: 14,945 SY Hot-Mix Asphalt Surface Removal, 2 ¼”; 7,484 SY Hot-Mix Asphalt Surface Removal, 3”; 1,785 SY PCC Surface Removal, Variable Depth, 0 to 1 ½”; 11,335 SY PCC Surface Removal, Variable Depth, 1” to 2 3/4”; 1,406 SY PCC Surface Removal, 1 ¼” to 2 ¾”; 114 SY PCC Surface Removal, Variable Depth, 1 ½” to 3”; 12,000 SY Area Reflective Crack Control; 2,112 feet Full Depth Saw Cut for Crack and Seat; 4,256 SY Crack and Seat Existing PCC Pavement; 661 SY PCC Pavement Removal, Special; 404 SY HMA Pavement Removal, Special; 135 tons Aggregate Base Course, Type B; 18,000 pounds Bituminous Materials (Prime Coat); 18,500 pounds Bituminous Materials (Tack Coat); 15,000 feet Longitudinal Joint Sealant; 628 tons Polymerized HMA Binder Course, IL-4.75, N50; 651 tons HMA Binder Course, IL-9.5FG, N50;