Specifications include, but are not limited to: The driveway located at 214 E Park Avenue has ~1/4” steel edging. Contractor shall take care when cutting this steel edging to ensure clean edges are left where the driveway will meet the proposed sidewalk. Contractor shall use a metal cutting torch or equivalent means to ensure a high-quality cut is provided. Contractor shall be responsible for replacing any damaged sections of steel edging with identical edging along with sod replacement as required to reinstall damaged edging. Description. This work shall consist of constructing hot-mix asphalt driveway pavement on a prepared subgrade. Materials. Materials shall be according to the following: (a) Hot-Mix Asphalt - Mix “D”, N50 (b) Coarse Aggregate – CA-6