Specifications include, but are not limited to: he bidder shall submit a project plan using the design standards below that is in compliance with allapplicable HUD, EPA, and State of Illinois regulations as well as all local building and zoning codes. Theplan must include a clear project timeline and budget with line item costs. The contractor shall act as thegeneral contractor for the project using subcontractors as required. Subcontractors that will be requiredshould be clearly identified in the project plan.Remove existing shingles down to sheathing. Check over all the existing roof sheathing for any waterdamage,brokenboards,andlargerthan½”gapsbetweensheathingreplaceasneeded.Ifasheathover is required a change order must be okayed by the Construction Officer before continuing. Patchthe existing holes from the turtle/can vents. Remove the sheathing at the ridge per shingle over ventmanufactures directions. Install ice and snow guard around the lower section of roof making sure tocover at least a 2 ft over top plate on the exterior walls below. Installed approved water barrier overthe remainder roof. Install 30-year architectural shingles homeowners’ choice of colors. New shingleover ridge vent. New chimney flashing and counter flashing. New plumber boots over the vents andsplitringforthemastflashing.New2”whitestyleDroofedge.Permitrequiredbeforeworkstarts