Specifications include, but are not limited to: 1. Site work including provision of all utilities to within the building ”stubbed” out ready for future interior work in Phase Two. All utilities, water, sewer, electrical shall be provided into the main level of the building in Phase One. Removal of landscaping and the fence on the east side of the property in the disturbed areas of construction are within your scope of work. 2. All foundations, exterior and applicable bearing interior walls, floors (framed and slab on grade) shall be installed. Including sub slab insulation and foundation insulation. Upper level interior walls are not part of this scope of work. 3. All site grading, parking areas, drainage elements for parking areas and roof drainage, shall be installed. 4. All exterior finish materials and painting of siding, columns, beams, stairs, railings, roofing, gutters, downspouts shall be installed. Also included are windows, and all exterior doors