Phase 1: Weights and Measures - Full roof replacement, complete demolition of suspended ceiling system, geothermal HVAC system, lighting, exterior overhead doors, interior doors and frames, and restrooms. Install a new standalone HVAC system, suspended acoustical ceiling system, LED lighting, overhead exterior door, interior doors, frame, hardware and new restrooms. The Necropsy will consist of new overhead door, exterior main door, LED lighting work platform, miscellaneous plumbing and interior painting. Phase 2: ISDA Administration Building – Will consist of the demolition of the main floor suspended ceiling system, lighting, and insulation below the roof. Install new batt insulation below the roof, suspended ceiling system, and LED lighting system. At the Basement level replace existing lighting fixtures with new LED lights.