The work covered under this contract will be performed along Moses Drain, within the existing Moses Drain easement. The overall project will consist of a furnishing and installing Solid Wall PVC irrigation pipeline of approximately 3,600 lineal feet. The gravity irrigation pipe alignment will collect drainage from the existing 15.0 North Lateral traveling west along Homedale Road and flow northwest along the eastern bank of Moses Drain. This first section of irrigation pipe will be 18-inches in diameter and will collect flow from the 15.0 South Lateral, which flows north along N Midway Road. The irrigation pipe will increase to a 24-inch pipe after connecting with the South Lateral. An existing storm drain pipe will require relocation at the South Lateral connection. The irrigation pipeline will continue to flow northwest along the eastern bank of the Moses Drain. The pipeline will connect to the existing Highline Canal concrete structure north of Laster Street.