This work includes but is not limited to the full reconstruction of the runway, lighting, striping, NAVAIDS, electrical, & drainage. This work is federally funded. C-100-14.1 Contractor Quality Control Program (CQCP) C-102-5.1 Storm Water Pollution Prevention Plan (SWPPP) C-102-5.2 Implement Approved SWPPP Allowance of $5,000 C-102-5.3 Erosion and Sediment Control C-105-6.1 Mobilization P-101-5.1 Full Depth Shoulder / Blast Pad / VSR / ARFF Pavement Removal P-101-5.2 Full Depth Pavement Removal, Taxiway P-101-5.3 Full Depth Pavement Removal, Runway P-101-5.4 Lap Joint Milling (3" To 6") P-101-5.6 Milling Removal and Restoration P-101-5.7 Drainage Inlet Removal P-101-5.8 Drainage Manhole Removal P-101-5.9 Drainage Cleanout Removal P-101-5.11 Remove Existing Storm Drain Pipe (Up to 18") P-101-5.12 Remove Existing Storm Drain Pipe (21" to 30") P-101-5.13 Remove Existing Underdrain Pipe P-101-5.17 Remove Existing Sanitary Sewer Main Pipe Line (10-14") P-101-5.18 Mitigation of Existing Sanitary Main Pipe Line (Asbestos) P-101-5.19 Remove Existing Sanitary Sewer Manhole