Specifications include, but are not limited to: The project site is situated on the island of Kauai at and adjacent to the Pacific Missile Range Facility (PMRF) in Kekaha. The scope of work includes operation and maintenance, Monday to Friday, of a drainage system consisting of two flap gates and one flood/sluice gate and one pump station consisting of one wet well, one steel footbridge, one 100-HP pump and two 200-HP pumps. Specialized tasks include maintaining electronic components of the motor control centers, troubleshooting pump malfunctions and maintaining electrical transmission poles and power lines. An on-island project manager for the duration of this multi-year contract shall be available during working hours plus two hours after working hours.