Specifications include, but are not limited to: The Contractor shall furnish all labor, equipment, materials and supervision to satisfactorily complete all work as described below. 1) Provide and install new Flow Meters for Tank 1, Meters to be Waterflux 3070, Krohne, or Equal – to be approved by the County of Hawaii Department of Water Supply (DWS) and DHHL. (Manufacturer Data Attached.) 2) Provide and install a Level Sensor for Tank 2, Manufacturer – Omega, or Equal – to be approved by DWS and DHHL. (Photo Attached.) 3) Inspect the existing SCADA System and provide a working system to include the new Flow Meters and other necessary components to comply with the State of Hawaii, Department of Health requirements. System is to be compatible with the DHHL Master System, Mission or Equal, installed in Molokai. Inspection i) The Contractor shall provide daily reports with photos of the work in progress along with Certified Payroll on a weekly basis. ii) DHHL will make periodic inspections to verify work in progress for payments invoiced by the Contractor. iii) The Contractor shall notify DHHL prior to any work being done not indicated on the contract documents iv) The DHHL reserves the right to conduct periodic and unscheduled inspections at any time to observe and evaluate site conditions. v) The Contractor shall keep the site clean and neat at the end of each workday. Disposal of construction debris shall be contained or hauled to a proper landfill by the last workday of each week.