The Contractor shall furnish, deliver and install all materials, labor, tools, and work to construct items as indicated on Drawings and as specified herein, including but not limited to the following items: 1. Provide new electric bus charging system at the Kalihi-Palama Bus Facility. Provide new electrical service, infrastructure, communications, lighting, for bus charging system and commissioning of charger per manufacturer’s requirements. New electric bus charging system shall be compatible with new electric busses being acquired by OTS. 2. Before bidding on this work, carefully examine the drawings titled “Kalihi-Palama Bus Facility Installation of Electric Bus Charging System at the Ready Line” (hereinafter referred to as the “Drawings”) and the site. By submitting a proposal of the work included in this contract, the Contractor shall be deemed to have made such examination and to be familiar with and accept all conditions of the job site.